P-3 Orion  

.

AIRFRAME

Phased Depot Maintenance

-  NAVAIR P3 PDM
-  NAVAIR P-3 SSP
-  NAVAIR 01-75PAA-6 to 01-75AA-6-4

Customer Additional Requirements
Compliance with AFC, AFB, PPC, PPB.
Additional Inspections arising from HAI’s DLM Experience
Aging Study
Crash Damage Evaluation & Repair
Hard Landing Inspection & Repair

Corrosion Control / Strip & Paint

ACCESSORIES OVERHAUL, REPAIR, MODIFICATIONS & UPGRADES

Landing Gear System
Flight Controls System
Fuel System
Pneudraulics System
Electrical System
Instruments System
Communication/Navigation System
Propulsion System

EGRESS / Weapons / Life Support

 

Line1.jpg (890 bytes)

The entire site created and designed by HAI

Proprietary of  Hellenic Aerospace Industry S.A. All rights reserved.